Where The Current Goes: Shunt Current And Weld Spacing

2026/11/23

últimas notícias da empresa sobre Where the Current Goes: Shunt Current and Weld Spacing

Where the Current Goes: Shunt Current and Weld Spacing

Every spot welding schedule is written for one weld. Production, however, never makes one weld: it makes a row of them, and each weld after the first is made on a part that already conducts. That is shunt current, and it is the reason a setting that welds beautifully at the end of a panel produces a cold weld in the middle of it.

The mechanism is simple. Current leaves one electrode, crosses the interface, and returns through the other electrode. But it will also return through any other conductive path between the two sheets, and a weld you have already made is an excellent one: it is metal, it is continuous, and it is closer to the electrodes than the far end of the part.

últimas notícias da empresa sobre Where the Current Goes: Shunt Current and Weld Spacing  0

A bracket with four tabs spot welded to the plate. The outer welds were made first; by the time the inner ones were made, the current had a shorter way home.

The Fraction That Never Reaches the Nugget

The current that bypasses the tips does no useful work at the interface you are trying to weld. In a tight row on thin sheet it can be a substantial share of the total — a fifth, a third, occasionally more — and it grows as the row gets longer, the pitch gets shorter and the sheet gets thinner.

Thin sheet is the worst case for a reason that is easy to see once it is stated: shunt current travels through the sheet, and the resistance of that path falls with thickness. A 0.8 mm panel offers the current a much easier detour than a 3 mm one. This is why the same schedule that behaves on a bracket misbehaves on a thin panel with the same number of welds.

There is a second path that is easy to forget: the fixture. A steel jig that touches both sheets, or an earth clamp bolted to the part rather than to the machine, adds a return path that has nothing to do with the weld and everything to do with how much current arrives at it.

How Spacing Buys You Back

The single most effective control is distance. Spacing the welds further apart lengthens the shunt path, raises its resistance, and pushes current back through the tips where you want it. The usual rule of thumb is a minimum pitch of several times the nugget diameter, or roughly ten times the sheet thickness, and the two rules agree often enough to be useful as a first check.

Where the design does not allow that spacing — and on a rail with three fasteners, or a bracket with four tabs, it usually does not — the alternatives are to change the sequence or to change the schedule. Sequence first, because it costs nothing: welding from the centre outwards, or alternating ends, keeps the growing shunt path away from the tips for longer than a simple left-to-right pass.

The schedule change is a stepped current: a lower value for the first weld in the row and a higher one for the welds that follow, or a step-up function in the controller that adds a few percent per weld. It is a crude compensation, but it is compensation for a real effect, and it is far better than the alternative most shops choose, which is to set the current for the worst weld in the row and accept that the first one spatters.

últimas notícias da empresa sobre Where the Current Goes: Shunt Current and Weld Spacing  1

Three nut plates welded along one galvanised rail. On a part like this, the third weld is made through a circuit that already includes the first two.

The Loop That Ruins a Shift

The failure mode is worth describing because it is so common and so misread. The operator makes a row, sees the last weld is cold, and raises the current. Now the last weld is acceptable and the first weld of the next part expels metal, because it was made with no shunt at all. The operator lowers the current slightly, the last weld goes cold again, and the shift is spent in a loop that no setting can win.

The symptom — "the machine will not hold a setting" — is almost never the machine. It is a schedule written for a weld that does not exist in production, applied to a row where every weld is electrically different from its neighbour.

Three Sheets, and the Path You Forgot

A three-sheet stack adds a third interface and a second way for the current to cheat. The outer sheets are in direct contact with the electrodes, so a weld between them can form while the interface in the middle — the one the drawing actually needs — stays cold. The nugget you can see is not the nugget you were asked for.

This is why three-sheet stacks are specified with the weld made from the thin side, or with a process that forms two nuggets at slightly different times, and why the peel test on such a part has to be done twice: once for each interface. A single peel that separates cleanly between two sheets proves only that those two were welded.

Coated and adhesive-bonded stacks complicate the same picture from the other direction. A layer of zinc or a film of structural adhesive between the sheets raises the resistance of the interface, which reduces shunt but makes the contact less predictable from part to part. The schedule tolerates one or the other well; it tolerates both at once only if somebody has measured it.

A Spacing Check You Can Do at the Drawing Stage

Before a part is quoted, the pitch and the thickness can be compared on paper, and most of the shunt problems we are asked to solve would have been visible then. The table below is the quick version.

Pitch against thickness

What to expect

What to do

Wider than 12 x thickness

Shunt is small, one setting covers the row

Nothing

8 to 12 x thickness

Shunt noticeable on the later welds

Step the current, or alternate ends

Under 8 x thickness

Later welds run cold, operator compensates

Change the sequence and the schedule

Under 5 x thickness

Row cannot be welded on one setting

Redesign the pitch, or weld in two passes

None of that requires new equipment. It requires the schedule to be written for a row rather than for a weld, which is a difference of about ten minutes at the quotation stage and a week of arguing later.

Questions Worth Asking Before the First Part

  • How many welds share a current path, and how far apart are they, in millimetres rather than in "about a hand"?
  • Does anything in the fixture touch both sheets, including clamps, locating pins and earth returns?
  • Is the row welded in one pass or can it be split, and does the operator have a reason to weld it in the order chosen?
  • Has the schedule been proven on the last weld of the row, or only on the first?

A welding machine delivers current to two electrodes. What happens after that is a property of the part, and the part is usually designed before anybody thinks about it.

PDKJ continues to provide customized laser welding and resistance welding solutions based on different materials, workpiece structures, welding requirements, and production applications.

Related Products

últimas notícias da empresa sobre Where the Current Goes: Shunt Current and Weld Spacing  2

Our assembly floor in Dongguan. Sequence and spacing are decided here, on the part, before a schedule is written for the customer.

Contact PDKJ

Send us your part drawing or a sample, and our engineers will run a welding feasibility trial on your own material and recommend the equipment configured for your application.

WhatsApp: +86 136 1279 3248

Email: jay@gd-pw.com

Website: https://www.spotlaserwelding.com/contactus.html

Address: 1-2F, Building 3, Qichen Industrial Park, No. 26 Luxi 1st Road, Liaobu Town, Dongguan City, Guangdong Province, China